For the suggestions scheduling coverage
If the optional time quantum is provided for a selected scheduler that doesn’t require it. the program ignores that swap and For the suggestions scheduling coverage, the quantum is solely allowed to be 1 or 2 which means q = 1 and q = 2 quantum values from the e book. respectively.
Output File Format
The output file will look much like the enter file, however could have added the course of begin time, time spent in wait. end time, turnaround time and normalized turnaround time (as a float with 2 decimal factors) for every of the processes. Lastly it can listing the imply turnaround time and the imply normalized turnaround time (additionally as a float with 2 decimal factors).
“A”,zero,three,zero,zero,three,three,1.00 “C”,four,four,6,2,10,6,1.50 “B”,2,6,three,5,13,11,1.83 “D”,6,5,13,7,18,12,2.40 “E”,eight,2,18,10,20,12,6.00 eight.80,2.55
For the coverage on suggestions scheduling,
If the optional time quantum is accessible for a scheduler, it is not required. That swap is ignored by the software program. The quantum can solely be 1 or 2, implying q = 1 and q = 2 quantum values from the e book, respectively, for the suggestions scheduling scheme.
Format of the Output File
The output file will resemble the enter file, besides it can embody the course of begin time and the time spent ready. For every step, calculate the end time, turnaround time, and normalized turnaround time (as a float with two decimal factors). Lastly, the imply turnaround time and the imply normalized turnaround time might be provided (additionally as a float with 2 decimal factors).
“A”,zero,three,zero,zero,three,three,1.00 “C”,four,four,6,2,10,6,1.50 “B”,2,6,three,5,13,11,1.83 “D”,6,5,13,7,18,12,2.40 “E”,eight,2,18,10,20,12,6.00 eight.80,2.55 “B”,2,6,three,5,13,11,1.83 “D”,6,5,13,7,18,12,2.40 “E”,eight,2,18,10,20,