TASK1

Choose one of the titles "5S / Kaizen / Just in time production". Prepare a report by examining a sample application on the subject you prefer. Please write the source (s) you benefited from under the report.

Who Can Write My Dissertation or Research Paper? Best Writing Service!

Looking for reliable dissertation help or thesis writing? Our expert team of MPhil and PhD-qualified professionals provides top-notch online assistance for dissertations, research papers, and essays—free from errors, plagiarism, and hidden fees. We select each specialist based on their academic expertise, ensuring high-quality thesis writing and research paper support. Beyond writing, we offer personalized guidance, one-on-one doubt-clearing sessions, and free study resources. Whether you need instant dissertation help or long-term research paper support, our experts are ready to help you succeed.

TASK2
In the same assembly line, it is desired to produce a total of 100 products, 20 from A, 30 from B and 50 from C, in 5 hours. Information on A, B, C products are given in the table below. Make the balancing of the line according to the position weight method and calculate the tasks of each station and the efficiency of the line.

Product A Product B Product C
Task No Duration (min.) Predecessor task Task No Duration (min.) Predecessor task Task No Duration (min.) Predecessor task
1 3 - 1 3 - 1 3 -
2 4 1 2 4 1 4 2 1
6 2 2 3 3 1 5 1 4
7 4 6 6 2 2,3 6 2 5
11 1 7 7 4 6 9 5 6
8 8 6 10 1 9
11 1 7,8 11 1 10

TASK3
Draw the current state value flow map for the ABC factory according to the information given below.
When you examined the current value flow map you drew, which sources of waste did you identify? Briefly explain

ABC factory manufactures various parts for cars. The "steering rod" produced in various features was chosen as the product family. The customers of this factory are the automobile manufacturer factories and after-sales service authorized services.
Due to the great variety in product configurations and the customer's configuration requests differ from demand to demand, the steering arm is made to order. The production time of the product in ABC is 27 days. Due to the long production time and delayed orders, it takes 60 days for the product to be delivered to the customer. In addition, ABC's customers can only make accurate predictions for two-week orders, so they make adjustments to orders 2 weeks before shipping. These order corrections require speeding up orders at the workshop.
Although the ABC production control department reports the orders to production in the order they receive from the customer, the orders are accumulated according to the product configuration to reduce the time loss in mold change. In this case, the order requires an estimation.

What Are Custom Dissertation and Thesis Writing Services? Just Essays?

Our custom dissertation help and thesis writing services meet your unique requirements. Unlike companies using pre-written content, we craft every dissertation, research paper, or essay from scratch based on your specific instructions and grading rubric. A subject-specialized writer will deliver a well-researched dissertation or thesis tailored just for you. Beyond essays, our academics and scholars offer PowerPoint presentations, cover letters, editing, tutoring, and business reports—comprehensive dissertation help and research paper support for all your academic needs.

Product
• The steering rod is a metal rod with iron brackets welded to both ends.
• ABC's steering rods are produced in 20 different lengths, 2 different diameters, 3 different iron bracket assemblies.

Customer requests
24000 steering bars per month
• Customer orders range from 25 to 200, the average is 50.
• Packaging is made in cardboard boxes containing a maximum of 5 pieces.
• Several times a day deliveries are made to various customers by truck.
• Each customer's configuration request varies greatly from order to order.
• The ABC factory requests the order to be placed 60 days before delivery.
• Customers usually make changes to the order two weeks before delivery.

Can I Hire Someone for Dissertation Help or Thesis Writing to Score Top Grades?

Completing dissertations or research papers can be overwhelming, but expert dissertation help and thesis writing are smart ways to improve your grades. Our platform connects you with top-rated tutors in education, law, and nursing, offering high-quality research paper support and sample resources. Working with experienced professionals enhances your dissertation or thesis writing, boosting confidence in your coursework—at affordable fees. Sign up today for instant dissertation help, research paper guidance, and stress-free learning!

Production Processes
• The production steps of the factory in ABC are as shown in the figure below. The processes for the steering rod product family in ABC begin with the cutting of metal rods. Welding of iron brackets to the two ends of the rod (one end at welding1 and the other end at welding2) is followed by the process of cleaning the welding burrs by machine. Parts are painted elsewhere outside the business and then painted parts are sent to the assembly line. Iron brackets attached to both ends of the metal bar are also produced in ABC. The assembled parts are packaged and shipped to the customer daily.

• Model change between bar lengths in cutting, welding and cleaning processes is 15 minutes.
• Mold change between bar diameters in cutting, welding and cleaning processes takes 1 hour. This change takes a long time because the quality control demands are very high.
• On machines where iron brackets are processed, mold change between bracket types takes 2 hours.
• Steel bars are supplied from XYZ factory. The supply period is 16 weeks. There are two deliveries per month.
• Iron bracket raw materials are supplied from KLM factory. The supply period is 12 weeks. There are two deliveries per month.

Operation time
• There are 20 working days a month.
• Two shifts are worked in all production departments.
• Each shift is worked 8 hours, if necessary, overtime.
• There are two 15-minute breaks per shift.
• Manual operations are stopped during breaks. There is no payment for lunch.

ABC Production Control Department
• The customer receives his order 60 days in advance and enters the MRP program.
• Creates a work order for each customer, which tracks the order throughout the entire production process.
• Send work orders to production 6 weeks before shipment to run MRP for steel bar and iron bracket raw material order.
• Prepares daily priority lists for units related to production. Production unit managers order the orders in their departments according to this list.
• Receives customer changes 2 weeks before shipment and allows units to speed up those orders.
• Prepares a daily shipping schedule to the shipping department.

Process Information
1. Cutting (Performs bar cutting for various ABC products)
- Manual operation with 1 operator
- The cycle time is 15 seconds.
- Mold change time: 15 minutes for length, 1 hour for diameter.
Machine reliability 95%
Observed stock:
* 20 days of uncut bar stock before cutting and 5 days of cut bar stock

2. Welding Station 1 (assigned to this product family)
- First machined iron bracket metal bar is welded. An automated process that uses an operator to load and unload
- The cycle time is 30 seconds. (operator time 10 sec.)
- Mold change time: 15 minutes for length, 1 hour for diameter.
Machine reliability 85%
Observed stock: 3 days

3. Welding Station 2 (dedicated to this product family)
- The second machined iron bracket metal bar is welded. It is an automatic process that uses an operator for loading and unloading.
- The cycle time is 30 seconds. (operator time 10 sec.)
- Mold change time: 15 minutes for length, 1 hour for diameter.
Machine reliability 75%
Observed stock: 3 days

4. Cleaning Station (dedicated to this product family)
- Automatic process using the operator in loading and unloading
- The cycle time is 30 seconds. (operator time 10 sec.)
- Mold change time: 15 minutes for length, 1 hour for diameter.
Machine reliability 95%
Observed stock: 5 days

5. Painting (steering bar is sent out for painting process)
- Painting supply period is 2 days
- A truck will fetch the painted parts a day and take the unpainted ones.
- Observed stock: 2 days at the place where the paint was made, 6 days for the parts painted in ABC

6. Final Part Assembly (assigned to this product family)
- 6 operator manual operation
- Total processing time per part 195 sec.
- Mold change time: 10 min. Changing apparatus
Machine reliability 95%
- Observed finished product stock: 4 days

7.Iron Bracket Processing (assigned to this product family)
- Single machine automatic machining process
- The cycle time is 30 seconds.
- Mold change time: 2 hours.
Machine reliability 95%
Observed stock:
 Raw material from 20 days supplier
 4 days of machined part

8. Shipment
- Takes the parts from the finished product warehouse and prepares them for shipment by truck.

Tags: online essay writers, help write my paper AI free, cheap dissertation writer, buy essay uk, best trans tutors, Write my essay for me

Why choose Homework Ace Tutors

You Want Quality and That’s What We Deliver

Top Academic Writers

We’ve put together our writing team with care, choosing talented writers who shine in their fields. Each one goes through a tough selection process, where we look for folks with deep expertise in specific subjects and a solid history of academic writing. They bring their own mix of know-how and flair to the table, making sure our content hits the mark—packed with info, easy to read, and perfect for college students like you.

College Prices

We don’t do AI-written essays or copycat work—everything’s original. Competitive pricing is a big deal for us; we keep costs fair while delivering top-notch quality. Our writers are some of the best out there, and we charge rates that stack up well against other services. This means you get stellar content without draining your wallet. Our pricing is straightforward and honest, built to give you real value for your money. That’s why students turn to us for high-quality writing services that won’t break the bank.

100% Plagiarism-Free

Academic integrity is at the heart of what we do. Every paper starts from scratch, with original research and writing tailored just for you. We write 100% authentic—no plagiarism research essays. Our strict quality control process includes scanning every draft with top tools like SafeAssign and Turnitin, so you get a similarity score and proof of originality. We’re obsessive about proper citation and referencing too, crediting every source to keep things legit. It’s all about giving you peace of mind with content that meets the highest standards.

How it works

When you decide to place an order with Dissertation Writer, here is what happens:

Complete the Order Form

You will complete our order form, filling in all of the fields and giving us as much detail as possible.

Assignment of Writer

We analyze your order and match it with a writer who has the unique qualifications to complete it, and he begins from scratch.

Order in Production and Delivered

You and your writer communicate directly during the process, and, once you receive the final draft, you either approve it or ask for revisions.

Giving us Feedback (and other options)

We want to know how your experience went and the marking criteria grade you scored. You can leave a review recommending a writer for your class and course mates.