Academic Writing Experts For Your Research Projects

Order custom papers, masters thesis and dissertation in 3 guided steps; human written!

Posted:

Intermittent flow operations

1. Intermittent flow operations:a. involve close management of workers.b. generate a high product mix.c. have few schedule changes.d. have high turnovers of raw materials andwork-in-process inventories.2. Continuous flow operations:a. utilize general-purpose equipment.b. are capital-intensive operations.c. have unpredictable material flows.d. have work centers grouped together byfunction (department).3. Repetitive manufacturing:a. assembles pre-made parts into finished goods.b. produces one basic product with minor variations.c. is characterized by very low equipment utilization.d. utilizes highly trained, flexible labor.4. Design capacity is:a. sustainable capacity.b. capacity dictated by the firm’s built-in organizationalconstraints.c. theoretical capacity.d. actual output.5. The stepping-stone method is used to:a. obtain an initial (1st) solution.b. balance source supply and destination demand.c. evaluate occupied cells (routes) for possible cost reductions.d. evaluate empty cells (routes) for possible cost reductions.6. Which of the following statements is true?a. evaluation paths selected must be as short as possible.b. evaluation paths may contain diagonal movements.c. occupied cells may not be bypassed if turning movements are desired.d. all occupied cells of each solution must be evaluated.7. The intent of the load-distance model is:a. to minimize the number of workers.b. to minimize idle time per cycle.c. to minimize materials and / or information movement costs within a process layout.d. none of the above.8. Which of the statements about line-balancing is true?a. if a precedence relationship exists between tasks A and B, they cannot be assigned to the same work station.b. if a line’s balance delay factor is maximized, its efficiency is maximized.c. the theoretical minimum number of work stations can never be achieved, hence the name “theoretical”.d. if the cycle time is reduced, productivity will increase.9. Hybrid or combination layouts:a. were developed by Henry Gantt in 1901.b. require the use of work-in-process inventories between the pure layouts.c. are similar in their characteristics to fixed-position layouts.d. are rarely encountered in industry.10. Which of the following statements is true?a. line-balancing attempts to eliminate bottleneck tasks via product redesign and better worker training.b. the efficiency of an assembly line cannot be improved by selecting a different task assignment heuristic for theline-balancing process.c. an assembly line is perfectly balanced when there are an equal number of tasks in each work station.d. “efficiency” is defined as an assembly line’s ability to meet desired daily output.11. The Behavioral School approach to job design which attempts to make a worker a “co-manager” is:a. job enlargement.b. job enhancement.c. job rotation.d. job enrichment.12. The 5 categories of activities (operation, transport, inspection, delay, and storage) are used in which of the following methods of process analysis?a. gang chart.b. simo chart.c. multiple activity chart.d. motion economy chart.13. The procedure that involves performance ratings and allowance factors is:a. historical experience. c. direct time studyb. work sampling.. d. pre-determined time study.14. In cross-docking, labeled and presorted loads are received directly at the warehouse dock for immediate re-routing.TRUE FALSE15. A job shop helps a firm follow a differentiation marketing strategy.TRUE FALSE16. Group technology layouts are used to convert assembly lines into job shops.TRUE FALSE17. The Northwest-Corner technique produces a deliberate cost-efficient solution for the transportation algorithm.TRUE FALSE18. Work sampling is widely used to analyze repetitive jobs.TRUE FALSE19. The maximum allowable cycle time guarantees that the firm will meet itsdaily production quota.TRUE FALSE20. The direct time study method makes allowances for unscheduled interruptions, unusual delays, and unusual mistakes on the part of the worker.TRUE FALSE21. In the transportation problem, the number of cells in an evaluation path should always be an odd number such as “5”, “7”, or “9”.TRUE FALSE22. One of the limitations of the transportation algorithm is that it cannot minimize shipping costs between two levels of the supply chain.TRUE FALSENine (9) welders who perform the identical short-cycle job were observed by a time + motion engineer over six (6) cycles each. The total time recorded was three-hundred-ten (310) minutes. The performance rating for a particular welder was established at ninety-two percent ( 92% ). Additionally, each welder is granted a twelve percent (12%) allowance for personal needs, fatigue, and routine delays.23. The observed time ( OT ) for this job is 5.833 minutes.TRUE FALSE24. The normal time ( NT ) for the selected welder ? 5.280 minutes.TRUE FALSE25. The standard time ( ST ) for the selected welder ? 6.000 minutes.TRUE FALSE41. The sources of a transportation matrix are either factories or outside vendors.TRUE FALSE42. Evaluation numbers are either ‘positive’ or ‘negative’.TRUE FALSE43. When total source units exceed total destination units, an additional row must be included on the transportation matrix.TRUE FALSE44. Qualitative factors are considered in the use of the transportation algorithm by the operations staff when locating retail facilities.TRUE FALSE45. The gravity location model uses shipping costs to locate a central distribution center.TRUE FALSE46. The gravity location model locates the central distribution center at the geographic center of the distribution system.TRUE FALSE47. The transshipment model can accommodate multiple levels of the supply chain simultaneously.TRUE FALSE48. The transshipment model can accommodate multiple modes of transport.TRUE FALSE49. The transshipment model utilizes a sophisticated version of the transportation algorithm.TRUE FALSE50. The gravity location model draws part of its input from the current monthly or quarterly forecasted demands at each facility in the distribution system.TRUE FALSE

Tags: est Ideas for Research Paper Topics in, Undergraduate Dissertations Topics Examples Ideas, Trending Dissertation Topics & Ideas For, Thesis and Dissertation Ideas for Research Topics in UK, Thesis Topics for Your Masters Degree, Thesis Topics for Your Final Academic Project

Why choose Homework Ace Tutors

You Want Quality and That’s What We Deliver

Top Academic Writers

We’ve put together our writing team with care, choosing talented writers who shine in their fields. Each one goes through a tough selection process, where we look for folks with deep expertise in specific subjects and a solid history of academic writing. They bring their own mix of know-how and flair to the table, making sure our content hits the mark—packed with info, easy to read, and perfect for college students like you.

College Prices

We don’t do AI-written essays or copycat work—everything’s original. Competitive pricing is a big deal for us; we keep costs fair while delivering top-notch quality. Our writers are some of the best out there, and we charge rates that stack up well against other services. This means you get stellar content without draining your wallet. Our pricing is straightforward and honest, built to give you real value for your money. That’s why students turn to us for high-quality writing services that won’t break the bank.

100% Plagiarism-Free

Academic integrity is at the heart of what we do. Every paper starts from scratch, with original research and writing tailored just for you. We write 100% authentic—no plagiarism research essays. Our strict quality control process includes scanning every draft with top tools like SafeAssign and Turnitin, so you get a similarity score and proof of originality. We’re obsessive about proper citation and referencing too, crediting every source to keep things legit. It’s all about giving you peace of mind with content that meets the highest standards.

How it works

When you decide to place an order with Dissertation Writer, here is what happens:

Complete the Order Form

You will complete our order form, filling in all of the fields and giving us as much detail as possible.

Assignment of Writer

We analyze your order and match it with a writer who has the unique qualifications to complete it, and he begins from scratch.

Order in Production and Delivered

You and your writer communicate directly during the process, and, once you receive the final draft, you either approve it or ask for revisions.

Giving us Feedback (and other options)

We want to know how your experience went and the marking criteria grade you scored. You can leave a review recommending a writer for your class and course mates.