Software Engineering|Computer Science
The ultimate step within the work for the course is to finish the appliance improvement and shut out the mission. Venture closure shouldn’t be the tip of the mission; however relatively, it’s a handoff of accountability from the mission improvement crew to the upkeep and help crew.
For this task, repair any excellent defects within the utility, and be certain that the mission is able to transfer into manufacturing.
Project Particulars:
Summarize the steps which might be required for closure of the mission, together with closing launch verification and sign-off.
Doc set up and deployment directions for the appliance.
Doc upkeep directions.
Launch candidate of utility.
Embrace a zipper file of well-documented mission code.
Embrace a abstract from the group on the general mission expertise, classes realized, and an analysis of the group’s efficiency.
Zip all contents collectively in a zipper file named “groupname_SWE482_GP5.ZIP.”
Submit the file for grading.
Every crew member must submit a PPT (at the least Eight-12 slides) presentation to current a very powerful takeaway primarily based on the duties assigned to him/her.